A typical South Florida bathroom remodel takes three to six weeks from demolition to final walkthrough. Here is what happens in each phase so you know exactly what to expect.
Weeks one through three are design and permitting. Final selections for tile, fixtures, and finishes happen first, because material lead times drive the schedule. Most cities require permits for bathroom work involving plumbing or electrical changes, and your contractor should handle the applications.
Demolition takes one to three days. The old fixtures, tile, and drywall come out, and this is when hidden issues surface: old plumbing, water damage, or framing that needs attention. A contingency in your budget covers surprises without derailing the project.
Rough-in comes next: plumbers and electricians run new supply lines, drains, wiring, and lighting, followed by inspections. Then waterproofing goes in, which is the most critical step in a humid climate. Do not let anyone skip or rush it.
Tile and surfaces take the longest visible stretch, usually one to two weeks. Floors, shower walls, and any accent tile are set and grouted, then the room starts looking like a bathroom again.
Fixtures and finishes follow: vanity, toilet, shower glass, mirrors, lighting, and hardware. Paint and final details come last, then a thorough punch list and walkthrough.
The most common delays are material backorders, permit review queues, and change orders mid-project. Locking selections early and avoiding changes once work starts is the single best way to stay on schedule.